How to compare off‑plan projects.

Brochures are designed to be compared on feeling. This scorecard compares them on evidence, using the same five questions I put to every project.

In short: score each project from 1 to 5 on developer, location, product, payment plan and exit. Any project scoring below 3 on any one question drops off the list, however well it scores elsewhere. Then compare the survivors on total cost.

The scorecard

QuestionWhat to checkRed flags
DeveloperCompleted projects, on-time handovers, quality of finished buildings, current pipelineLittle delivery history, repeated delays, many projects launched at once
LocationInfrastructure in place or committed, competing supply due nearby, end-user demandLarge volumes of similar stock handing over at the same time; reliance on promised but unfunded infrastructure
ProductLayout efficiency, usable area, orientation, views, specification, build detailsAwkward layouts, large unusable areas, vague specifications
Payment planAmount due by handover, handover balance, total cost including fees, price per square footA generous plan hiding a high price; a large handover balance with no clear funding
ExitResale conditions before handover, comparable resale and rental evidence, likely tenant profileStrict resale restrictions, thin comparable evidence, an exit that depends on prices rising

How to score

  1. Gather the same information for every project: SPA draft, payment plan, floor plans, specification and handover date.
  2. Score each question from 1 (weak) to 5 (strong), writing one line of evidence for each score.
  3. Remove any project with a score below 3 on any question.
  4. Compare the remaining projects on total cost and on the amount due by handover.
  5. Decide on the evidence, then visit the show apartment to confirm, not the other way round.

The engineer's questions

From my civil engineering background, these are the questions most buyers do not think to ask:

  • Who is the main contractor, and what have they built before?
  • Is the quoted area internal, or does it include balconies and walls?
  • Which specifications are committed in the contract, and which are "indicative"?
  • How far has construction progressed, as reported through official channels?